翻訳と辞書
Words near each other
・ Thuret family
・ Thuret, Puy-de-Dôme
・ Thureth
・ Thurey
・ Thurey-le-Mont
・ Thurgarton
・ Thurgarton railway station
・ Thurgarton Wapentake
・ Thurgarton, Norfolk
・ Thurgartstone
・ Thurgau
・ Thurgau frank
・ Thurgauer Zeitung
・ Thurgoland
・ Thurgoland railway station
Thurgoland Tunnel
・ Thurgood
・ Thurgood (play)
・ Thurgood Marshall
・ Thurgood Marshall (disambiguation)
・ Thurgood Marshall Academy
・ Thurgood Marshall College
・ Thurgood Marshall College Fund
・ Thurgood Marshall Early College High School
・ Thurgood Marshall Federal Judiciary Building
・ Thurgood Marshall High School
・ Thurgood Marshall High School (Baltimore, Maryland)
・ Thurgood Marshall High School (Dayton, Ohio)
・ Thurgood Marshall High School (Missouri City, Texas)
・ Thurgood Marshall School of Law


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Thurgoland Tunnel : ウィキペディア英語版
Thurgoland Tunnel

Thurgoland Tunnel is a double-bore abandoned railway tunnel between Penistone and Wortley. Its total length is . The original tunnel, a single bore carrying two tracks, was opened in 1845 on the Sheffield, Ashton-Under-Lyne and Manchester Railway between Manchester Store Street and Sheffield.
It is characterised by a curve of radius on a falling gradient of 1 in 131. Due to the difficulties in laying the original tunnel out, it consists of a series of straight sections in a series of erratic curves varying in radius from . Maximum clearance was only obtained by reducing the normal six-foot spacing between the tracks.
Because of the clearance problems the original construction caused for the planned LNER electrification, and because opening-out was deemed too expensive, in 1948 a second single-line tunnel was built for the up line and the old tunnel was converted to carry only the down line. As this project was begun in 1947 just before railway nationalisation (British Railways), each of the up tunnel portals host twin dates, with "LNER 1947" inscribed in the central parapet panel at the top of the portals and "BR 1948" below in the keystone. Due to the anticipated interim period of steam working before Woodhead New Tunnel was completed, a cast-iron smokeplate lined the roof of the tunnel to protect the concrete lining.〔Johnson, E M (2001). Woodhead, The Electric Railway. Stockport: Foxline. p. 18-20. ISBN 1-870119-81-9.〕 Electric working commenced in 1954 and ceased in 1981.
The tunnels ceased to carry trains in 1983 when the local Sheffield–Huddersfield train service was diverted via Barnsley.
The up tunnel, being much newer, has been re-utilised for a walking trail, whilst the down bore has been blocked off.〔http://www.thewoodheadsite.org.uk/Trt/MapC/MapC.htm File C071L.jpg〕
== See also ==

* Manchester-Sheffield-Wath electric railway

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Thurgoland Tunnel」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.